Transmission time for Powerlinc commands
Posted: Sun Nov 07, 2004 2:46 pm
I have written a script like the sample in the help that ramps up a light over a period of time. The switch is a Leviton that responds to the Leviton Dim Level commands and the interface is the Powerlinc. I have noticed that it appears to take about five seconds to transmit each command.
This seems like a *really* long time and makes it tough to do things like ramping up a light over two or three minutes since a five second interval will take over eight minutes to go from 0 to 100. Does anyone have an idea of how fast a Powerlinc transmission typically takes? Does this behavior seem normal?
EDIT: in troubleshooting this a bit more, here is what *appears* to be happening although this makes no sense. The rest of the switches in my house are PCS and they have an LED that blinks whenever X-10 activity occurs. When I used a button that does +=1 or -=1 to set the Preset Dim Level on a PCS switch and pushed it repeatedly it appeared to take less than one second per command.
When I did the same thing on a button mapped to the Leviton Dim Level on this Leviton switch the activity LED showed *three* tranmisssions (each about one second apart) followed by a one second pause. I only pushed it *once* and this sequence of events occurred. I had this property mapped to a gauge so then I held it for a bit so the repeat would kick in. The same events occurred like clockwork and during each sequence of events the value on the gauge only increased by one.
-- Dave
This seems like a *really* long time and makes it tough to do things like ramping up a light over two or three minutes since a five second interval will take over eight minutes to go from 0 to 100. Does anyone have an idea of how fast a Powerlinc transmission typically takes? Does this behavior seem normal?
EDIT: in troubleshooting this a bit more, here is what *appears* to be happening although this makes no sense. The rest of the switches in my house are PCS and they have an LED that blinks whenever X-10 activity occurs. When I used a button that does +=1 or -=1 to set the Preset Dim Level on a PCS switch and pushed it repeatedly it appeared to take less than one second per command.
When I did the same thing on a button mapped to the Leviton Dim Level on this Leviton switch the activity LED showed *three* tranmisssions (each about one second apart) followed by a one second pause. I only pushed it *once* and this sequence of events occurred. I had this property mapped to a gauge so then I held it for a bit so the repeat would kick in. The same events occurred like clockwork and during each sequence of events the value on the gauge only increased by one.
-- Dave